Substation FS25 v1.0.0.0 (1.6.x)
0 58 8

The power plant
[+] Construction cost 650,000 €
[+] Cycles per month 960
[+] Cost 360 € per month
[+] Recipes: 150x maintenance, 1000x solar energy | = 3000x electric charge
[+] Recipes: 150x maintenance, 750x wind power | = 3000x electric charge
[+] Storage: 75,000 maintenance, 250,000 solar energy, 250,000 wind energy, 1,000,000 electric charge

The solar system
[+] Construction cost 150,000 €
[+] 240 Cycles per month
[+] Cost 120 € per month
[+] Recipes: 150x maintenance | = 3000x solar power
[+] Stoarge Maintenance 75000, Solarpower 250000

Wind Turbine system
[+] Construction cost 180,000 €
[+] 240 Cycles per month
[+] Cost 120 € per month
[+] Recipes: 150x maintenance | = 1500x wind power
[+] Stoarge Maintenance 75000, Windpower 250000

Unpack the archive!

Credits: SBModding, MFG Sidoxgamer

Photo


Download381.65 MB


TAGS:v1.0.0.0, Substation, (1.6.x), FS25

SIMILAR MODIFICATIONS

COMMENTS
avatar